Processing days events for campaign day: 1944-06-09 (Day 0)

Damage received during the mission

Supply PointCountryDamage ReceivedEnding supply level
Total Allied damage received: 0
Total Axis damage received: 0

New campaign day is 1944-06-10 (Day 1)

Calculating front line with 4000m coarse step size and 150m fine step size.

Front line: 209 positions. 1306, 1307, 1308, 1408, 1409, 1510, 1610, 1611, 1711, 1811, 1812, 1912, 2012, 2112, 2212, 2213, 2313, 2413, 2513, 2613, 2612, 2712, 2812, 2912, 2911, 3011, 3110, 3209, 3309, 3308, 3408, 3508

Calculating supply flows amongst airfields and objectives

Using resupply scaling ratio 1.00

Flowing supply from supply generating points to nearby supply points

Flowing supply from non-supply generating points to nearby supply points

Resupplying supply-generating points

Resupply reduced by 0 for Axis, based on yesterday's events such as airframe losses
Total supply regeneration for Axis: 0
Resupply reduced by 0 for Allies, based on yesterday's events such as airframe losses
Total supply regeneration for Allies: 0

Repairing objectives enough to be plausibly killable

Summary of resupply

Supply pointCountryResuppliedFinal supply level
Gournay en Bray Armour Repair DepotGermany0300.0
Rouen Rail YardsGermany0500.0
Cabourg Coastal DefencesGermany0300.0
Lisieux Ball Bearing FactoryGermany0300.0
Vimoutiers Sawmill and Logging StationGermany0300.0
Argentan Switching YardGermany0300.0
La Ferte Mace Troop EncampmentGermany0300.0
Perche HFDF Testing FacilityGermany0300.0
Chartres Coal Gas Processing OperationGermany0300.0
Abbeville DrucatGermany0200.0
Beaumont Le RogerGermany0200.0
Beauvais TilleGermany0200.0
DreuxGermany0200.0
GuyancourtGermany0200.0
Le Havre OctevilleGermany0200.0
LonraiGermany0200.0
TriquevilleGermany0200.0
Dieppe Saint AubinGermany0200.0
Barneville Logistics WharfGreat Britain0300.0
Arromanches Mulberry BGreat Britain0500.0
CarpiquetGreat Britain0200.0
CrettevilleGreat Britain0200.0
MaupertusGreat Britain0200.0
Villedieu Fuel DepotUnited States0300.0
Vire Command And LogisticsUnited States0300.0
PontorsonUnited States0200.0
La VielleUnited States0200.0

Calculating play area for 1944-06-10 (Day 1)

Campaign state has 44 total supply points to consider.
Play area NW: (250270.0,0.0,64965.0) (in grid 1304)
Play area SE: (25270.0,0.0,244965.0) (in grid 3522)
Play area center: (137770.0,0.0,154965.0) (in grid 2413)

Calculating available airframes and loadouts based on supply levels

Airfield Triqueville (Germany) with supply 200.0 at distance 53km to the front line was assigned 16 airframes, including 0 'iconic' loadouts.
Airfield La Vielle (United States) with supply 200.0 at distance 48km to the front line was assigned 8 airframes, including 0 'iconic' loadouts.
Airfield Dreux (Germany) with supply 200.0 at distance 130km to the front line was assigned 16 airframes, including 0 'iconic' loadouts.
Airfield Guyancourt (Germany) with supply 200.0 at distance 177km to the front line was assigned 16 airframes, including 0 'iconic' loadouts.
Airfield Abbeville Drucat (Germany) with supply 200.0 at distance 165km to the front line was assigned 16 airframes, including 0 'iconic' loadouts.
Airfield Maupertus (Great Britain) with supply 200.0 at distance 76km to the front line was assigned 8 airframes, including 0 'iconic' loadouts.
Airfield Pontorson (United States) with supply 200.0 at distance 47km to the front line was assigned 8 airframes, including 0 'iconic' loadouts.
Airfield Dieppe Saint Aubin (Germany) with supply 200.0 at distance 105km to the front line was assigned 12 airframes, including 0 'iconic' loadouts.
Airfield Le Havre Octeville (Germany) with supply 200.0 at distance 28km to the front line was assigned 6 airframes, including 0 'iconic' loadouts.
Airfield Carpiquet (Great Britain) with supply 200.0 at distance 14km to the front line was assigned 6 airframes, including 0 'iconic' loadouts.
Airfield Lonrai (Germany) with supply 200.0 at distance 54km to the front line was assigned 16 airframes, including 0 'iconic' loadouts.
Airfield Beaumont Le Roger (Germany) with supply 200.0 at distance 78km to the front line was assigned 16 airframes, including 0 'iconic' loadouts.
Airfield Beauvais Tille (Germany) with supply 200.0 at distance 173km to the front line was assigned 16 airframes, including 0 'iconic' loadouts.
Airfield Cretteville (Great Britain) with supply 200.0 at distance 81km to the front line was assigned 8 airframes, including 0 'iconic' loadouts.

Enabling 'pop-up' objectives in areas of interest

Using 'create offensive pushes' pop-up activation mode

Templating mission for 1944-06-10 (Day 1)

Advancing the campaign took 15.4 seconds.